Introducing Deutz (WP6G125E22) engine with low emission, low noise ,low fuel consumption and excellent productivity.
InquiryOptional equipments (additional price needed)
◆ Cummins 6BT5.9-C130 engine
◆ Pilot control
◆ Payload measurement system
◆ Light/Heavy material, Log Grapple,Grass Grapple
◆ Grammer seat
◆ Air condition
Excellent performance
◆ Transmission and torque converter are superior in excellent universality and low maintenance cost.
◆ Introducing Deutz (WP6G125E22) engine with low emission, low noise ,low fuel consumption and excellent productivity.
◆ Unique and novel appearance, independent instrument assemble, driving cab with detachable design to ensure wide operation space, excellent view, comfortable seat.
◆ Long arm (optional) can be close to 5t wheel loader for the dumping height(about 3.1M).
◆ Fixed-spindle gearbox with four speed shifts forward and two backward.
◆ Excellent whole-machine performance and extraordinary operation efficiency.
◆ Suitable for excavation and high unloading operation condition.
◆ Short wheel base shorten working cycle time.
Performance | |
Bucket capacity | 2.7m3 |
Rated load | 5.0t |
Operating weight | 16.6t |
Max.climbing gradient | ≥28° |
Breakout force | ≥170kN |
Max.tranction force | ≥155kN |
Total time | 10.0s |
Engine | |
Type | WD10G220E21 |
Rated power | 162kW |
Rated speed | 2200r/min |
Max.torque | 850Nm |
Total air displacement | 9.726L |
Rated fuel consumption rate | ≤215g/(KWh) |
Transmission system | |
Hydraulic torque conterver | |
Type | YJSW315-6J01-22 |
Torque vcoefficient | 4.4±0.24 |
Gearbox | |
Type | ZL50 |
Transmission pressure | 1.2~1.5MPa |
Driving axle | |
Reduction ratio | 23.276 |
Tyre | |
Specification | 23.5-25 |
Tyre pressure | 0.30MPa |
Electrical system | |
Voltage | 24V |
Battery type | 6-QW-120B |
Travel speed | |
Forward gear Ⅰ | 11.5km/h |
Forward gear Ⅱ | 36km/h |
Reverse gear Ⅰ | 16km/h |
Steering system | |
Steering pump displacement | 80ml/r |
Working pressure | 16MPa |
Number of steering cylinder-bore×stoke | 2-φ100×324 |
Working hydraulic system | |
Number of lift cylinder-bore×stoke | 2-φ160×799 |
Number of tilt cylinder-bore×stoke | 1-φ200×563 |
Displacement of working pump | 100ml/r |
Working pressure | 16MPa |
Distribution valve DF32.2C D32-00 | |
Brake system | |
Driving brake(Foot-brake) | |
Air-pushing-oil disc brake on four wheels | |
Parking brake(Hand-brake) | |
Cable-controlled callper disc brake |
Welcome customers from home and abroad to come to the company for on-site inspection and work together for mutual development
07067492128
fcenergysales@gmail.com
water front Femi Owolabi Jim Crescent/Adebayo Ajaguna Street, Alogba Estate (Zone C), Ikorodu,Lagos
View on Mobile
Copyright © 2023-2024 FC ENERGY. All rights reserved
Powered by WDL